The pump sits between the excavator and the framer
Footings, slabs on grade, pads and frontage, placed to the schedule the rest of the build is running to.
On a commercial job the whole chain is waiting on the cure
The concrete is in the middle. Everybody after it is waiting on it, and a pour that slips a day pushes the framer, the inspector and everyone behind them. So the two things that matter are being there on the day and saying so early when weather is going to move it, rather than on the morning.
Three trucks and three operators means the schedule has some depth in it. It also means the person you booked with is the person who turns up.
Frontage, and why the setup point is the whole job
One of the photographs on our Google listing is a frontage pour: a wide wet slab with dowels along the edge, shops and a signalized intersection immediately behind it. On that kind of site you get one truck position, chosen around traffic, pedestrians and whatever the municipality lets you occupy.
Reaching the entire pour from that one position is the difference between a morning and a full day, which is why it gets worked out before the concrete is booked rather than at seven with mixers stacking up behind you.
What we place on the commercial side
Footings and grade beams, slabs on grade, warehouse and shop floors, loading and dumpster pads, equipment bases, and sidewalk frontage.
The carrier record is public: USDOT 2127687, active, intrastate Florida, three power units, zero crashes and zero out of service events in the twenty four months to September 8, 2026. On a job where your general liability position depends on who you let on site, that is worth two minutes of anyone's time.


What 35 homeowners said
Every quote below is a real review, word for word, from our Google profile.
Man, First time using K&R and these guys do it and do it right. Corey and Chris are top notch pump guys that put it in there right. I will only use this company for now on. If I could give 10 stars I would. I been around concrete a long time and these are model employees that you want to represent your company well.
We had a wonderful experience with the crew from K&R. They showed up 30 minutes early, let us know about an issue with our supplier, and talked us through the entire process. They went above and beyond by helping us (first time DIYers) out, giving us advice and tips, and when it started pouring rain they even helped us hoist up the tarp to get the job done. We are so pleased with the service we received and would highly recommend K&R.
We used K&R to pump our house foundation, 50+ yards of concrete. These guys showed up on time and ready to work. They were super nice, and helpful. They jumped right in to lend a hand, going above and beyond what they needed to do. I would highly recommend this company. Its super hard to find good workers these days but these guys are it!
I've been using K and R for 3 years now. And they are my main concrete pumping contractor. Very happy with their work. Always on time
The owners of this business were very outgoing, willing to help out with whatever my needs were and made sure that I was 100% satisfied. Most important, they were the most kind people that I have ever dealt with.
Just want to give a big shout out to Kenny and Rhonda you guys are awesome slab turned out great and all I can say is you guys are always the easiest people to get along with and I really appreciate you guys
Boom pump placement for foundations, slabs and flatwork across Pasco and Hillsborough County.
We cover concrete pumping, house foundations & footings, slabs, pads & flatwork, hard access & waterfront pours, concrete delivery and concrete orders & scheduling. Every one of them has its own page with what is included.
We work in Wesley Chapel, Land O' Lakes, Lutz, Zephyrhills, Tampa, Odessa, Trinity, New Port Richey, Dade City and Temple Terrace. If you are just outside that, call and ask, we will tell you straight.
4.4 out of 5 across 35 Google reviews. The reviews block on this page links to them.
If the mixer can back to within about sixteen feet of the pour and discharge downhill, no. Past that you are into wheelbarrows, and on anything over a few yards the pump is usually cheaper than the labor once you count what a slow placement does to the finish.
It depends which of the three trucks the job gets and where it can safely set up, so it gets answered on the call rather than guessed here. Tell us how far the pour is from where a truck can park and what is overhead.
Concrete Orders and Concrete Delivery are both listed on our Google Business Profile. Give us the mix, the yardage and the time and we will place it with the plant and space the trucks around your crew.
Tell us about the pour.
The date, the yardage and where a truck can park. That is most of what we need to give you a number.