Book the Pump for Your Pour (813) 991-4544
Wesley Chapel, FL

Concrete goes where a chute never reaches

Boom pump placement for footings, foundations and slabs across Pasco and Hillsborough County. Three trucks and three operators, out of Wesley Chapel.

4.435 Google reviews
  • Three trucks, three operators
  • Pasco and Hillsborough County
  • Monday to Friday, 8 to 5
The work

Pours we have placed

See the full portfolio
View from inside the pump truck cab of a crew placing and screeding a foundation at dusk
On the truckThe pour from the operator's seat
Wide wet concrete slab poured to a street frontage with forms and dowels along the edge
CommercialFrontage flatwork, freshly placed
Cream and blue Mack cab over concrete boom pump truck, unit 321
The fleetUnit 321
Boom pump line over a freshly placed house slab with two crew running power trowels
FoundationsHouse slab placed and being finished
White boom pipe lit up over a formed slab at night surrounded by pine woods
Night workNight pour in the pines
Concrete block walls rising above a finished foundation under a blue sky
FoundationsBlock going up on the finished pad
Braced column forms with rebar cages standing on a Gulf front building lot
WaterfrontColumn forms on a Gulf front lot
Boom pipe reaching down into excavated footings on a riverfront lot with a dock behind
WaterfrontFootings dug on a riverfront parcel

Call the yard

(813) 991-4544, Monday to Friday, eight to five.

Who we are

The pump is not about distance, it is about time

A ready mix truck discharges about sixteen feet from the back of the drum, downhill, in a straight line. That covers a driveway apron and almost nothing else. Everything past it is either wheelbarrows or a pump, and people usually think the choice is about reach.

It is really about the clock. Concrete starts setting the moment it leaves the plant, and every part of finishing a slab has to happen inside a window that a Florida afternoon closes fast. A fifty yard monolithic pour placed by barrow is setting at one end while it is still arriving at the other, and you get a cold joint through the foundation of the house.

A boom places at the rate the finishers can actually work. That is the whole mechanism, and it is why a pumped slab tends to finish flatter and cure more evenly than the same mix placed slowly. Nothing to do with the concrete.

3
Pump trucks and three operators
29
Of the 35 Google reviews are five star
0
Crashes on the federal safety record
Mon to Fri
8am to 5pm, our published hours
Boom pump line over a freshly placed house slab with crew running power trowels

Rather send it in writing?

Send the pour date, the yardage and the address and you will get a call back with a number.

Why us

Why people book the same three trucks

Three trucks, three operators, no broker

The federal MCS-150 filed in August 2025 lists three power units and three drivers. When a truck rolls out, one of three people is driving it, and you already spoke to them.

Customers name the operators

A review from August 2024 names Corey and Chris and says they put it in right. People only learn the operators' names when the same people keep turning up.

The pour finishes together

A monolithic slab has to go before the first section sets. A boom places at the rate the finishers can work, which is how you avoid a cold joint through the middle of a foundation.

Nothing crosses your yard

The truck stays on the drive and the line goes over the roof, the fence and the screen cage. No panels out of the pool enclosure and no barrow ruts through the lawn.

Early rather than on time

One customer wrote that the crew showed up thirty minutes early and flagged a problem with their supplier before it became a problem on the slab. Another, on a fifty yard house foundation, wrote that they showed up on time and ready to work.

Clean record with the DOT

USDOT 2127687, active, intrastate Florida. Zero crashes and zero out of service events in the twenty four months to September 8, 2026. You can look it up yourself.

How it goes

How a pour day actually runs

01
Tell us about the pour

The address, the yardage, the mix and the date. If you do not know the yardage, give us the dimensions and we will work it out with you.

02
We look at the access

Where a truck can stand on firm ground, what is overhead, and how far it is to the furthest corner of the pour. This is the part that decides the day.

03
The order gets timed

Concrete Orders is on our Google profile. We can place it with the plant and space the trucks so your crew is never waiting and never buried.

04
Set up, prime, place, wash out

The pump is on site ahead of the first mixer. The line gets primed, the pour runs at the rate your finishers can work, and the washout goes where we agreed rather than into a storm drain.

Concrete pump truck set up on outriggers beside a formed foundation

Could not get through?

If nobody picks up, you get a text back with a time we can talk.

Reviews

What 35 homeowners said

Every quote below is a real review, word for word, from our Google profile.

4.435 Google reviewsRead them on Google
Man, First time using K&R and these guys do it and do it right. Corey and Chris are top notch pump guys that put it in there right. I will only use this company for now on. If I could give 10 stars I would. I been around concrete a long time and these are model employees that you want to represent your company well.
john lajbAugust 2024Verified Google review
We had a wonderful experience with the crew from K&R. They showed up 30 minutes early, let us know about an issue with our supplier, and talked us through the entire process. They went above and beyond by helping us (first time DIYers) out, giving us advice and tips, and when it started pouring rain they even helped us hoist up the tarp to get the job done. We are so pleased with the service we received and would highly recommend K&R.
Madelyn MorleyAugust 2023Verified Google review
We used K&R to pump our house foundation, 50+ yards of concrete. These guys showed up on time and ready to work. They were super nice, and helpful. They jumped right in to lend a hand, going above and beyond what they needed to do. I would highly recommend this company. Its super hard to find good workers these days but these guys are it!
Sydnee WingertMay 2023Verified Google review
I've been using K and R for 3 years now. And they are my main concrete pumping contractor. Very happy with their work. Always on time
Anh NguyenMarch 2025Verified Google review
The owners of this business were very outgoing, willing to help out with whatever my needs were and made sure that I was 100% satisfied. Most important, they were the most kind people that I have ever dealt with.
Juanop LgvoltJune 2023Verified Google review
Just want to give a big shout out to Kenny and Rhonda you guys are awesome slab turned out great and all I can say is you guys are always the easiest people to get along with and I really appreciate you guys
Next level diesel repairFebruary 2021Verified Google review

Boom pump placement for foundations, slabs and flatwork across Pasco and Hillsborough County.

Questions

Questions we get asked

(813) 991-4544

If the mixer can back to within about sixteen feet of the pour and discharge downhill, no. Past that you are into wheelbarrows, and on anything over a few yards the pump is usually cheaper than the labor once you count what a slow placement does to the finish.

It depends which of the three trucks the job gets and where it can safely set up, so it gets answered on the call rather than guessed here. Tell us how far the pour is from where a truck can park and what is overhead.

Concrete Orders and Concrete Delivery are both listed on our Google Business Profile. Give us the mix, the yardage and the time and we will place it with the plant and space the trucks around your crew.

Where trucks come in and turn around. Where the pump can set up on firm ground. What is overhead. Whether anything was dug or backfilled recently. And where the washout goes. Photographs of the approach beat any description.

Monday to Friday, eight in the morning to five in the afternoon. Those are the hours on our Google profile. One of the photographs on that same profile is a night pour, so ask about your job rather than assuming either way.

We cover concrete pumping, house foundations & footings, slabs, pads & flatwork, hard access & waterfront pours, concrete delivery and concrete orders & scheduling. Every one of them has its own page with what is included.

We work in Wesley Chapel, Land O' Lakes, Lutz, Zephyrhills, Tampa, Odessa, Trinity, New Port Richey, Dade City and Temple Terrace. If you are just outside that, call and ask, we will tell you straight.

4.4 out of 5 across 35 Google reviews. The reviews block on this page links to them.

Contact

Tell us about the pour.

The date, the yardage and where a truck can park. That is most of what we need to give you a number.

Call or text(813) 991-4544
Shop6641 Angus Valley Dr, Wesley Chapel, FL 33544

Tell us about the pour

Required. Everything else is optional.

Add your emailoptional

Your details go to K & R only. No spam, no list.

Prefer to talk? Call (813) 991-4544.

Call the yard direct.

Monday to Friday, eight to five. You get one of the three operators.

(813) 991-4544
Call (813) 991-4544 Book the Pump